Kahramma Phase 10 (Transmission Dept) (13 No of 220, 132 and 66 KV Substations)
GTC 371(B+D) 2010
Kahramma Phase 10 (Transmission Dept) (13 No of 220, 132 and 66 KV Substations)
Main Contractor:
Siemens W.L.L.- Qatar
Completion Year:
2015
Status:
Completed
Detail / Work Description:
- Supplying and installation of support structure.
- Laying of 132 and 66kV cables.
- Supplying and Installation of Sunshield Cable Protection.
- Supplying and installation of support structure.
- Laying of 11kV cables.
- Termination of 11kV cables.
- Testing of 11kV cables.
- Supplying and Installation of sunshield Cable Protection.
- Supplying and installation of support structure.
- Laying of 33kV cables.
- Termination of 33kV cables.
- Testing of 33kV cables.
- Supplying and Installation of
- Sunshield Cable Protection.
Substations:
# | Substation Name | Completion Year |
---|---|---|
1 | 66/11kV Sheraton Park Substation (Underground) | 2015 |
2 | 66/11kV Gharafa North Substation(Upgrade) | 2014 |
3 | 66/11kV Doha Industrial F Substation | 2014 |
4 | 132/11kV Al Khissa West Upgrade Substation | 2014 |
5 | 66/11kV Vegitable Market Substation | 2014 |
6 | 66/11kV Umm Al Ghahab Substation (Replacement) | 2014 |
7 | 66/11kV Al Wajbah South Substation | 2014 |
8 | 132/11kV Abu Sidra Upgrade Substation | 2014 |
9 | 132/11kV PSS-3 Substation | 2014 |
10 | 66/11kV Doha Industrial C Substation | 2014 |
11 | 66/11kV Bin Mahmoud Substation | 2013 |
12 | 66/11kV Ministry Of Interior Substation | 2013 |